Project title: Design, planning and supervision of rhe Natural Gas Pipe Network and high pressure (38/25) Bar M/R Stations, as well as completion of the as Built Drawings for the project: «leasing and installation of spare gas turbine units at Lavrio steam power station».
Project owner / Employer: P.P.C. S.A./ TERNA S.A
Kind of services: detail design and supervision
Duration: 2004
Object of supply of services: The scope of the project regarding the natural gas pipe line was
- design and planning of the natural gas network and high pressure (38/25 mir) stations
- supervision of the natural gas pipeline and high pressure (38/25 mir) stations and completion of the as built drawings